A leader in electrical systems for power quality, distribution, and control.
Facebook Instagram YouTube linkedin
  • +91-9810015512
  • Select Currency: X
    FOX v.1.5.6
Select Currency: X
FOX v.1.5.6
semiconcart semiconcart
0 Wishlist
0 items / ₹ 0.00
Menu
semiconcart semiconcart
0 items / ₹ 0.00
Browse Categories
  • Power Diode
    • Diode Stud/Flat Type
    • Capsule Diode
    • Discharge Diode
    • Fast/Inverter Diodes
  • Diodes/RRA for Generators
  • Thyristors
    • Thyristors Stud/Flat Type
    • Capsule Type
    • Inverter Grade
    • AC Drive Thyristors
    • Inverter Thyristors
    • Converter Thyristors
  • Power Modules
    • Diode-Diode (IRKD)
    • Thyristor-Diode (IRKH)
    • Thyristor-Thyristor (IRKT)
  • Bridge Rectifier Module
    • Single Phase
    • Three Phase
    • Mono Block Bridge Rectifiers (Single Phase)
    • Mono Block Bridge Rectifiers (Three Phase)
    • Moulded Bridge Rectifiers for Generators
  • Three Thyristor Welding Module (PWB)
  • Bridge Rectifiers
    • Single Phase
    • Three Phase Square Type
  • Welding Bridge Rectifier (PTB)
  • Field Failure Relay
  • Solid State Rectifier
    • SSR(440V-AC/190V-DC)
    • SSR(230V-AC/190V-DC)
  • Selenium Rectifiers And Surge Suppressors
    • Rectifiers And Surge Suppressors For Alternators
    • Rectifier For Double Brake Operation
    • Single Brake Operation
  • Automatic Transfer Switch (ATS)
  • Automatic Voltage Regulator (AVR)
  • Home
  • About Us
  • Shop
  • Contact Us
Login / Register
APPLICATIONS
Click to enlarge
HomeDiodes/RRA for Generators R70NC/RC120(Long Lead)
Previous product
R70NC/RC120
R70NC/RC120 ₹ 138.00
Exclusive of all taxes
Back to products
Next product
Field Failure Relay
Field Failure Relay ₹ 978.00 – ₹ 1,265.00Price range: ₹ 978.00 through ₹ 1,265.00
Exclusive of all taxes

R70NC/RC120(Long Lead)

₹ 242.00

Exclusive of all taxes

  • Available in Normal & Reverse Polarity
  • All Diffused Series
  • Industrial Grade
  • Available in Avalanche Characteristic
Clear
Datasheet
Add to wishlist
SKU: N/A Category: Diodes/RRA for Generators
Share
Facebook Twitter Pinterest linkedin Telegram
  • Additional information
  • Reviews (0)
Additional information
Thread

M-8

Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “R70NC/RC120(Long Lead)” Cancel reply

Your email address will not be published. Required fields are marked *

Are you human? Please solve:Captcha


Related products

Quick View
Add to wishlist
Add to cart
Close

RRA (MXY/MXG55-12)

₹ 1,725.00
Quick View
Add to wishlist
Add to cart
Close

RRA (Crompton )

₹ 1,000.00
Quick View
Add to wishlist
Add to cart
Close

RRA (Triangle KEC Type)

₹ 950.00
Quick View
Add to wishlist
Select options
Close

R25NA/RA120

₹ 78.00
Quick View
Add to wishlist
Select options
Close

R40NB/RB160

₹ 100.00
Quick View
Add to wishlist
Add to cart
Close

RRA (Kirloskar Green small)

₹ 1,150.00
Quick View
Add to wishlist
Add to cart
Close

RRA (Kirloskar Green Big)

₹ 4,200.00
Quick View
Add to wishlist
Select options
Close

R40NB/RB120

₹ 94.00

100% Support

Available on email and phone number to help you at every step.

quality

Quality Products

Our products are backed with quality components, innovation, and the skills of highly talented individuals.

Secure Payment.

We offer all the payment modes for our customers including UPI, Credit/Debit Card, Net Banking, Wallet etc.

Contact details
Phone: +91-9810015512
Email: info@semiconcart.com
Products
  • Power Diodes
  • Bridge Rectifiers
  • Power Modules
  • Bridge Rectifier Module
  • Field Failure Relay
  • Solid State Rectifier
  • Thyristors
  • Welding Bridge Rectifier (PTB)
  • Three Thyristor Welding Module (PWB)
  • Blog
Useful links
  • Privacy Policy
  • Return Policy
  • Shipping Policy
  • Terms & Conditions
© 2022 Semiconcart. Designed and developed by zenwebnet.com
payments

Shopping cart

close
  • Menu
  • Categories
  • Power Diode
    • Diode Stud/Flat Type
    • Capsule Diode
    • Discharge Diode
    • Fast/Inverter Diodes
  • Diodes/RRA for Generators
  • Thyristors
    • Thyristors Stud/Flat Type
    • Capsule Type
    • Inverter Grade
    • AC Drive Thyristors
    • Inverter Thyristors
    • Converter Thyristors
  • Power Modules
    • Diode-Diode (IRKD)
    • Thyristor-Diode (IRKH)
    • Thyristor-Thyristor (IRKT)
  • Bridge Rectifier Module
    • Single Phase
    • Three Phase
    • Mono Block Bridge Rectifiers (Single Phase)
    • Mono Block Bridge Rectifiers (Three Phase)
    • Moulded Bridge Rectifiers for Generators
  • Three Thyristor Welding Module (PWB)
  • Bridge Rectifiers
    • Single Phase
    • Three Phase Square Type
  • Welding Bridge Rectifier (PTB)
  • Field Failure Relay
  • Solid State Rectifier
    • SSR(440V-AC/190V-DC)
    • SSR(230V-AC/190V-DC)
  • Selenium Rectifiers And Surge Suppressors
    • Rectifiers And Surge Suppressors For Alternators
    • Rectifier For Double Brake Operation
    • Single Brake Operation
  • Automatic Transfer Switch (ATS)
  • Automatic Voltage Regulator (AVR)
  • Home
  • About Us
  • Shop
  • Contact Us
  • Wishlist
  • Login / Register

Sign in

close

Are you human? Please solve:Captcha


Lost your password?
No account yet? Create an Account
Scroll To Top